• Get started
  • Sign In
  • EDUCATION HUB
      • Online courses
        • For homeowners
        • For professionals
        • Special offers
      • INFORMATION
        • Satisfaction policy
        • Frequently asked questions
  • BUILDING GUIDE
      • ASK THE EXPERTS
        • Planning and Design Questions
        • Foundation and Basement Questions
        • Wall and Roof Questions
        • Mechanical Systems Questions
        • Interior Finishing Questions
        • Exterior Finishing Questions
      • LATEST SUSTAINABILITY NEWS
        • Policy and Building Code News
        • Products and Materials News
        • Design News
        • Climate Change News
        • Renewable Energy News
        • Urban Planning News
        • Energy Efficiency News
        • Transportation News
        • Health and Well-being News
        • Architecture News
        • LEED Certification News
      • Planning and Design
        • Lifestyle, location and commuting
        • Grants and incentives
        • Mortgage financing and taxation
        • Building codes
        • Green building certifications
        • Concept and design
        • Off-grid and Net-Zero Housing
        • Materials and resources
        • Architecture and plan design
        • How to Find Qualified Green Building Professionals
        • Healthy indoor air quality
        • Waste management
        • Real estate
      • Foundations and Basements
        • Excavation
        • Radon in Homes - Mitigation
        • New foundations and slab-on-grade
        • Foundation and basement improvements
        • Waterproofing and drainage
      • Walls and Roofs
        • Wall assemblies - new construction
        • Wall assemblies - renovation
        • Air and vapour barriers
        • Insulation and soundproofing
        • Windows and doors
        • Roof assemblies - new construction
        • Roof assemblies - renovation
        • Roof coverings
        • Exterior cladding
        • Pest control
      • Mechanical systems
        • Heating and cooling
        • Ventilation
        • Plumbing and water heaters
        • Electricity
        • Renewable energy
      • Interiors
        • Walls and ceilings - interior surfaces
        • Flooring and stairs
        • Paints, finishes and natural coatings
        • Doors and trim
        • Kitchens
        • Bathrooms
        • Basement finishing
        • Interior design and furnishing
        • Cleaning and maintenance
        • Recycling and composting
      • Exteriors
        • Decks, porches and gazebos
        • Permeable laneways and patios
        • Landscaping
        • Rainwater Collection & Watering
        • Rainwater harvesting
        • Food production
        • Natural swimming pools and ponds
        • Greenhouses and Sunrooms / Solariums
  • FIND INSPIRATION
      • Project photos
        • Find ideas for sustainable & beautiful home renovations & building green homes
      • Green home projects
        • See sustainable homes that Ecohome has showcased over the last few years
      • Prefab kit eco homes
        • Find Net Zero prefab LEED & Passive House ready kit homes for sale
      • Green homes for sale
        • Sustainable homes for sale, green certified to LEED, Passive House or Zero Net Energy (ZNE)
      • Net Zero Energy Homes - Case Study
        • Showcasing a pilot project of 35 Net Zero Energy Ready homes built in 2021 in a cold climate
  • FIND PROFESSIONALS
  • FIND PRODUCTS

Capsys

Prefab and Modular Home Manufacturers

Contact this company

Capsys

  • 1 Service
  • CategoryPrefab and Modular Home Manufacturers
  • LocationLeola, PA, United States of America
  • Summary
  • Companies
  • Prefab and Modular Home Manufacturers
  • Save
  • Like
  • Share
      • Facebook
      • Twitter
      • Email

The Capsys Process

The Capsys Process is the set of procedures and practices we have developed to ensure that each module of every project moves in a well thought-out way from inception to finished building. Our construction process, fully adapted to the needs of the assembly line, is a sequence of steps that ensures that all of the necessary design detail is present at the beginning of the process, and is built into each module in an orderly sequence as it works its way down the line.

These are some of the critical aspects of this process:

Validation Before beginning any project we ensure that there is a good fit between the proposed building's structure and the dimensional relationships that are required for efficient and effective modular realization.

Coordination of Onsite and Offsite Activities In our experience the most under-appreciated requirement of the modular construction process is the necessity for good coordination between the Capsys offsite team and the various parties that make up the onsite team over the course of the project. This part of the Capsys Process provides a plan to guide the project from the preparation of the site, through the orderly erection of the modules at the site, to the integration of all the elements into the finished building.

The Design Process This part of the process is designed to ensure that the owner’s and the architect’s initial building concept is faithfully translated into a modular construction that satisfies both their requirements and the requirements of the modular construction process.

Fabrication The Capsys modular fabrication process takes place within our 75,000 SF climate controlled production facility located within the Brooklyn Navy Yard. The process moves construction off site to bring the order and control of an assembly line to the often chaotic craft/trade building system of a typical on site construction project. Our Union affiliated workforce take up their positions at stations near the materials and tools needed for their tasks. The building, in modular sections, moves from station to station coming to the workers rather that the workers moving throughout the building. Starting with the fabrication of the structural elements, components are added to the modules as they move through the factory. Windows, doors, MEP systems and fixtures, and trims are all installed along the line. The modules are then wrapped in protective materials and moved to temporary storage awaiting their trip to the building site to become part of the building project. While the site is being prepared and the foundations constructed, Capsys is fabricating the modules. When the site is prepared, a special team of Capsys modular erectors mobilize the setting scheme. A large hydraulic construction crane is staged to the site, modules are transported in a systematic order to the crane hook and modules are quickly stacked and welded to interconnect the modules into a unitized structural whole assembly. The erection process happens quickly, usually within a matter of a few weeks. The erection process happens quickly, usually within a matter of a few weeks.

Time One of the inherent benefits of the Capsys Process is the speed with which modules can come off the assembly line. This results in minimizing the time between project inception and, for example, a hotel being open for business. The modules for a 50,000 square foot building can be done in 8 – 10 weeks.

Services Provided

  • Prefab and Modular Houses

Related Searches

  • Prefab and Modular Home Manufacturers
  • Prefab
  • Modular
  • LEED
  • Offsite Construction

Company

  • About Ecohome
  • Become a member
  • Contact Us
  • Terms & Privacy

For professionals

  • Create a free business profile
  • Promote products & services
  • Become a contributor
  • Join discussions as a pro
All rights reserved © 2025 Ecohome NetworkFrançais

An error occurred. Sorry for the inconvenience.

Close